First, place the reactor logic adapter in any place in the reactor

Then place a computer and put a modem on the side

Open the computer, input: wget run http://alist.liulikeji.top/d/hfs/cc-scada 1.8.17-beta/ccmsi.luaa

Wait for download after downloading: CCMSI Install Reactor-PLC

Then enter Y and return to the car

When this appears, choose Y and then start installation

If this prompt appears, you can exit at any key, and then restart the computer

There will be a configuration interface, or click the blue button

This option is to connect to the Internet. If you still want to build other supporting facilities, you need to choose, and then Next

This is the reactor ID, the default is 1, if it is a multi -reactor system, each is different

This is independent cooling, generally not selected

This is a network port. If there are multiple reactor control systems, you need to configure yourself, otherwise the default

No need to worry about

This is the network key, which can be not input.

The following is irrelevant, always click Next

This interface point apply appears

Then exit enters the system

If you just need one urgent stop, then you don't need to watch it next (then you are wrong because this is not the essence of the system)


Connect the turbine with a wired modem, activation in the nuclear waste, and the dredging matrix (required interface)


The following steps can be omitted without controlling nuclear waste production

Use the immersed redstone line to link the neutron activation of the nuclear waste input pipe (required to click the pipeline) can also be connected in other methods.

Then linked the isotopes of folded heart pipeline, the neutron activates to the pressure reaction room pipe, and the neutron activates to the supercritical pipeline

Turn on the computer and enter wget http://alist.liulikeji.top/d/hfs/cc-scada-1.8.17-ccmsi.lua

Then enter CCMIS Install RTU

Still selected y

Installation completes the configuration interface, select the first one

This is the volume of the speaker, and the value is 0.0-3.0 (if it is not connected, there is no interface)

This is the network port

Still don't care

The network key needs to be the same as the input in the reactor

Then go back all the way back to the main interface

Select the third, configure the device link

Click add+

A bunch of equipment appeared here, and the mouse rolled down

Add the purple button on the left to add

This is to set this device belongs to that reactor, where is the same as the reactor ID

Then click Confirm in the lower right corner

Add all equipment in turn

Click to return to the homepage, select the fourth one, and perform redstone configuration

There are many here, but generally only these are required

[PU]: Enter the pipeline control

[PO]: Enter the pipeline control of neutron activated

[POPL]: The pipeline of the neutron activation to the pressure reaction

[AM]: neutron activation to the supercritical pipeline

Need configuration in turn (click text to enter the configuration)

OUTPUT SIDE is set the output surface. If it is not immersed in the redstone line, set an output surface for each.

Unit ID: consistent with the ID of the reactor

Then Confirm

Then configure the rest and then apply

After that, you can restart

This interface is complete


Next is the main controller

Place a computer and modem at any location

Then, as before, wget http://alist.liulikeji.top/hfs/cc-scada 1.8.17-ccmsi.lua

Enter CCMSI Install Supervisor

Install

Then restart the configuration

This is the number of reactors in the network

This is the number of equipment, the first is the turbine, and the second is the boiler

This is the port of all networks, to ensure that each one is the same as the previous port

The network link timeout, don't care

The scope of credibility, there are previously, you can ignore it

The network key is the same as before

Now the main control is installed, you can click the button above to see the link of each computer


Monitor

A reactor only requires 2 4x8 screens and a 4x4 screen to connect them with a computer (cable modem)

Then

The same is the wireless modem

Open the computer, download wget http://alist.liulikeji.top/d/hfs/cc-scada 1.8.17-ccmsi.lua

Then enter CCMIS Install Coordinator

Installation complete entry configuration

The network port, the internet timeout is the same as the main control, don’t care about it

No need to control the scope of credibility

Network key

When you click here, the green button will automatically synchronize the number of reactors in the main controlled reactor. If the failure fails, the following interface will appear

At this time, you need to set it by yourself.

This is the number of screens you need

You can choose to start the second option in the lower left corner, which will reduce a device monitoring screen at this time

This is screen ID and screen size


Screen ID will appear in the upper left corner of each screen

Configuration in turn, you just show how much screens are needed and how much you need to configure

Main: main control screen

Unit: The reactor control screen (if there are multiple reactors, you need multiple)

Flow: Device monitoring screen

Speaker volume

No need to care, then keep all until restarting

The screen you set will display information

This is the reactor control screen,

The lower left corner is the alarm information. If the flashing red light can be canceled by ACK !!IntersectionA single cancellation, the flashing red light will appear when there is a problem with the reactor

The lower right corner is the production setting, the first is to automatically control according to the left, the second is a centrifugal machine, the third is the neutron activation to the pressure reaction, and the fourth one is the supercritical

In the middle of the left is the reactor settings, which can be set, switch, switch

Start: Start

SCRAM stops, you need to press Reset after stopping

The main control screen, the control of all reactors on the left


On the right is the production settings and battery information of all reactors

Monitoring screen only view information