your current location:首页 > news>How to use the hydropower industry rejuvenation in industrial rejuvenation (INDUSTRIAL Renewal) Minecraft Game

How to use the hydropower industry rejuvenation in industrial rejuvenation (INDUSTRIAL Renewal) Minecraft Game

2024-12-10 17:50:15|Myriagame |source:minecraft skins

This tutorial is set by the author's setting without permission.

As a member of the technology guy, how can there be no tall hydropower facilities ~

· 0. The block you need to use (from left to right in the figure)

--- concrete, dam in the water outlet, dam out of the dam, high-voltage pipeline, dam turbine, dam generator

· 1. Build a dam

The process of building a dam is very simple, only a wall made of cement.The most efficient and smallest dam is recommended to be 13*11*1, and it is useless to use one inlet to put in the water outlet. The position is shown in the figure. The specific reasons will be introduced below.

--- This is the simplest dam, and the efficiency of entering the water outlet reaches 100%.(The actual construction should be underwater)

Note that the 11 -cell is not an absolute height. The height of the entry into the water outlet should be lower than the position of the 11 -cell of the relative water surface, otherwise the efficiency will not reach 100%

2. Installation equipment

With the entrance, other related equipment is placed.

Interface connecting the entrance to the upper part of the turbine;

The lower interface of the turbine connects the water outlet;

Place the generator above the turbine.

As shown in the figure

In this way, a hydropower system is done but cannot be generated because there is no water

· 3. Build examples

First, the entire pool must be:

As shown in the figure above, the detection range of a water outlet is as shown in the concrete part of the 13*11 shown in the figure. If the filling efficiency is not as required here, it will not be used.Overlapping, the efficiency of the water outlet of the rear will not reach the level, see the picture.

(From left to right) Figure 1: Single inlet and surrounding 13*11 are placed in the range of concrete, 100%efficiency;

Figure 2: The block within the probation range of the water outlet is less than the standard, and the efficiency is reduced to 99%;

Figure 3: Place the left inlet on the left, the detection range overlap, the efficiency is reduced to 22%, the right entrance is placed first, and the efficiency is reduced to 98%.

In summary, if you want to use the inlet to the maximum efficiency, at least 12 square meters between the two water outlets.

Note: The water port of the turbine must not be higher than that of the dam in the dam, otherwise the water will not enter.

Next, the whole shell ~

Because the width is 27 grid, I use two turbines here, and each efficiency can run to 100%.A single turbine generator generates a power generation of 1024FE/T. Compared with the IC2 hydropower 0.25eu/T (1Fe/T after the energy bridge is converted), this is the elder brother!

In fact, a water outlet is enough, just to do a few more 2333 for the sake of beauty

Let's decorate it again ~ You deserve to have the hard core decoration of industrial rejuvenation!

Income map:

In this way, a efficient and realistic dam power station will be built (big boo) Building residue does not like the creator (or liver survive player) who is not doing nothing.After all, where can I find a river with such a high gap in MC

Hurry up and try!