your current location:首页 > news>Pure MEK200MRF/T Cold Water Cold Stack Tutorial [MEK] Minecraft Game

Pure MEK200MRF/T Cold Water Cold Stack Tutorial [MEK] Minecraft Game

2024-12-10 17:50:37|Myriagame |source:minecraft skins

Read the front skills of this tutorial:

1: Construction of Qi Cold Reactor

2: Construction of Industrial turbo

3: Construction of Druting Matrix

4: Construction of thermal boiler

If you are not familiar with this, you can view it in the MOD data-multi-party block structure, and read the tutorial area to understand the usage

---

Be careful, a multi -block structure should try to be in a block.Therefore, all multi -block structures of this tutorial do not use limit size.

As shown in the figure, a 16*16*18 boiler can be placed in the 9th or 10th layer.

Now there are two layers of thermal components. In fact, only 77 are needed to drive a 200mrf/T turbine.

If the excess space of the upper layer is covered with hot -guided elements, it can drive 17 200mrf/T turbines.

In other words, a boiler close to the full match can bring up 3400mrf/T power generation.

Therefore, if you only want 200mrf/T power generation, you can appropriately reduce the boiler configuration.

Below is a 15*15*18 turbine

The steam flow of about 7700000MB/T can reach a maximum output. The conclusion of the first 77 thermal components with a turbine is concluded.

It is worth noting that the amount of water returning is far greater than the steam flow, so it is not necessary to connect to the water return pipeline, but there is no disadvantage.

After that, the counseling matrix can be used to increase the number of guidance suppliers according to the maximum output of the turbine.

For example, as long as I only need a 219mrf/T turbine, it needs 219/13.1, that is, 17 ultimate guidance suppliers

The most critical part is energy transmission, which can be achieved with the turbine valve closely to the dredging matrix port.

Note 1: The side of the turbine valve and matrix cannot have any structural glass!The turbine part needs to be filled with a turbine shell, and the matrix part should be filled with a tube.Do not do so, the multi -square structure will not be established (MEK's wonderful bug

---

Finally, let's talk about the specific process:

1: Water pump array pump water, and send the water to the lower layer of the boiler.The more water pumps, the faster the turbine reaches the maximum power generation. I use 20 full -speed pumps here

2: Connect the boiler with the hot -guided thread cable with the fusion reactor to heat up the boiler

3: The turbine back water pipeline is connected to the lower layer of the boiler

4: The upper part of the boiler is connected to the pipeline to pass through the turbine.This is a steam pipeline that needs to be stacked by pipelines

Remember, in large capacity transmission, you must not adjust the pipeline status

---

Why is the title called pseudo -water croak?

Because the official water -cooled reactor is useless, water must all provide boilers, and there is no need for the steam provided by the reactor.

(This can be proved, the reactor is a source of Baiji hot

---

In theory, a boiler can bring 17 major turbines, and a dredging matrix is ​​also connected with 16 turbine, so it seems that it seems that the 3200mrf/T power generation solution does not seem to be difficult to design?

---