your current location:首页 > news>Calculation -and the small method of fast refining [GT6] Gregtech 6 (Gregtech 6) Minecraft Game

Calculation -and the small method of fast refining [GT6] Gregtech 6 (Gregtech 6) Minecraft Game

2024-12-10 17:55:17|Myriagame |source:minecraft skins

There are many various tutorials on 坩埚 ... The main purpose here is also the safer carbon ravioli at the step of chromium 坩埚 2725K explosion temperature and 铱 2719k melting point.

Now the tutorial is recommended to use a very slow combustion room (Steel Burning Room (32HU/T)) or even a lead burning room (16HU/T)) to prevent explosion. This purpose is to use the fastest speed before tungsten.The dense chromium fluidized bed combustion room (1792Hu/T) completes the task.Here is the conclusion to calculate the calculation. Plain PlanTs uses 5 coking coal floods and 33 1/72 coking coal powder. The desert DESERT uses 5 coking pals and 29 1/72 powder (it is recommended to use the GT funnel to add it at one timeEnter a group, first plug 1/72 powder into the burning room) (Note that this conclusion is not applicable to a lower TPS server)

The fluidized bed burning room is a special solid burning room with some powder fuels and consumed the melting cricket.The amount of consumed melting squares is 2MB per 1/72 powder, that is, the powder fuel consumption per unit of pink fuel consumes 1 unit of melting crickets.The fluidized bed combustion chamber is 3 times HU at a speed of 4 times the speed of the ordinary solid combustion chamber (4 times that HU said in the encyclopedia is wrong. There are special fluidized bed page in the NEI interface.To.The following is the TOOLTIP of the dense chromium fluidized bed burning room. It can be seen that the cost is not high.

First of all, we look at the Tooltip in any solid burning room, such as this, chromium solid burning room

The solid combustion chamber converts the 1T combustion time to 25*burning room efficiency HU, and the efficiency of chromium is 85%, so there is 85%in subsequent calculations.

And this, any o TOOLTIP, here is chromatoscopic 坩埚

Each HU can heat up 100kg (total quality is 坩埚+坩埚 每 quality) to increase by 1k.Chromium -chromium is 5561.111kg.

Finally, this, alas.

The melting point of 1 is 2719k, and the mass of 1 unit is 2506.666kg.One mold+1 计 is the total of 11 units, and the excavation level of the pupa is 4. You may need 1 4 -level pick (3 units of ah head), then there are 14 铱, let's make up for 16 铱 铱EssenceThen the total mass of 坩埚+量 is 5561.111+2506.666*16 = 45667.767kg.

The start temperature is related to the ecological group. To be precise, it is related to the temperature attributes of the ecological group. Plain PlanTs 286K, Desert Desert 310K, I only use these two temperatures here for demonstration calculations. Other temperatures can be calculated by themselves.

The temperature difference between the ambient temperature and the melting point is 2433K (plain), 2409k (desert), the total HU required is (temperature difference)*(total quality, 100), 1111096.77Hu (plain), 1100136.51Hu (desert)

1 Units of coking coal powder can generate 240000Hu in the fluidized bed. The above results are divided into (240000*0.85) (if it is usually calculated in the calculation, it is requiredBurning time) The number of 1/72 coal poustics was 392.15 (plain, upward to 393), and 388.28 (desert, upward to 389).

The above results are converted to whole powder +1/72 powder form is 5 coking coal flood+33 1/72 coking coal powder, 5 coking coal pills+29 1/72 coking coal powder

Whether the final temperature meets the requirements

The calculation result of the plain contains the HU as the (240000Hu per coking coal powder, 3333HU each 1/72 coking coal powder):

5*240000+33*3333 = 1309989HU

1309989*0.85/(45667.767/100) = 2438.24K

2438.24+286 2724.24K, which is quite thrilling, but it is safe.In the same way, the end temperature of the desert is 2723.43K and it is very safe